Professional planning and scheduling across the project lifecycle

Professional Project Scheduling

Project scheduling is the professional service of building and managing credible project plans. Separate from any single tool, our scheduling practice covers planning strategy, master and detailed schedules, engineering through commissioning, look-aheads, and resource- or cost-loaded execution plans.

Scheduling Flow

Planning
Master Schedule
Detailed
Look-Ahead

Project Planning

Develop the overall execution strategy before detailed scheduling begins.

Master Schedule Development

Develop an Integrated Master Schedule covering the complete project lifecycle.

Milestone Planning

Establish contractual, engineering, procurement, construction, commissioning, turnover, and completion milestones.

Detailed Schedule Development

Develop Level 1 through detailed execution schedules depending on project requirements.

Engineering Scheduling

Schedule design and engineering deliverables so field work is not waiting on unresolved packages.

  • Design development
  • Design reviews
  • Submittals
  • Approvals
  • RFIs
  • IFC drawings
  • Engineering deliverables

Procurement Scheduling

Track materials and equipment from requirement through delivery so long-lead items do not drive late completion.

Commercial Path

  • Material requirements
  • Purchase orders
  • Submittals

Fabrication & Delivery

  • Fabrication
  • Factory testing
  • Shipping
  • Delivery
  • Long-lead equipment

Construction Scheduling

Schedule field execution with the granularity needed for coordination, crew planning, and progress reporting.

Area

By area and building zones

Building / Floor

By building and floor packages

System / Trade

By system, trade, and contractor

Work Package

By work package and sequence

Commissioning Scheduling

Plan and integrate commissioning so turnover is driven by tested systems, not unfinished punch lists.

  • Pre-functional testing
  • Functional testing
  • Equipment startup
  • Systems commissioning
  • Integrated systems testing
  • Punch-list completion
  • Turnover
  • Final acceptance

Look-Ahead Scheduling

Prepare near-term schedules that connect the master plan to weekly field execution.

2-Week

2-week look-aheads

3-Week

3-week look-aheads

6-Week

6-week look-aheads

90-Day

90-day schedules

Resource-Loaded Scheduling

Assign labor, equipment, materials, or other resources to scheduled activities.

Cost-Loaded Scheduling

Integrate budgeted project costs with schedule activities for time-phased project forecasting and performance analysis.